Eddie Stobart Distribution Centre

Project:
Eddie Stobart Distribution Centre

Client:
McLaren

Sector:
Commercial

Completion:
2018

The Project

Eddie Stobart, a leading logistics company with a fleet of over 2,200 lorries working across the UK and Europe, required maintenance and additional lorry bays at its Dagenham depot following expansion. Frequent heavy and slow-moving traffic at the busy distribution centre required a durable surfacing solution.

Our Work

We laid over 1,100 tonnes of ‘10mm SurePave HD Binder pmb’, a material specifically designed for heavy channelised, slow moving traffic in industrial areas such as lorry parks and bus lanes.

Due to its increased and harder grade of binder content, 10mm SurePave reduces the risk of cracking, has an increased stiffness, and improved flexibility and durability.

Results & Achievements

Working in collaboration with client to ensure no destruction to their day-to-day operation.

  • Defect Free
  • Increased Asset Resilience
  • Customer focused working: With Eddie Stobart operating 24/7, Toppesfield provided a delivery solution of phased working to ensure minimal disruption to the site. These works included complimentary planing and raising of ironworks.

To find out how Toppesfield can add value to your project contact estimating@toppesfield.com.

https://www.toppesfield.com/wp-content/uploads/2022/03/Case-Study_Eddie-Stobart-Distribution-Centre.pdf

Contact Toppesfield

Call 01473 829129 or email estimating@toppesfield.com to speak to a member of our team and discuss how we can add value to your next project. We’re always happy to answer questions and meet potential customers.