A failure of surfacing after heavy rain resulted in unsafe road conditions on the M25 Junction 18. However, with the Toppesfield can do attitude and the collaboration of our supply chain the unsafe conditions were swiftly rectified.
After receiving a call at 17:15 Toppesfield were able to deliver emergency works for Connect Plus on the M25 Junction 18 within 5 hours.
TM, planing, surfacing and lining works were all completed allowing safe access to the road with minimum disruption to the travelling public.