Three Sisters Race Circuit

Project:
Three Sisters Race Circuit

Client:
North West MotorSports

Sector:
Sports

Completion:
2018

The Project

As the North West’s most challenging track, used daily for racing, vehicle testing and leisure karting, when it was time for maintenance Three Sisters Circuit in Wigan required a robust surfacing solution to withstand such rigorous use.

The site also required delivery to their new ‘Bambino’ track, a smaller area designed for younger drivers starting out in motorsports.

Our Work

Toppesfield planed and resurfaced the 1.5km circuit using echelon paving techniques, reducing the longitudinal joints This offered the client asset resilience and reduced the need for further maintenance.

Over three shifts Toppesfield planed over 16,800m2 and a further three shifts saw the delivery of 1820 tonnes of material.

Results & Achievements

  • Delivered to Schedule
  • Received Gold Notices from Essex Highways

‘Toppesfield used innovative working methods to reinforce the circuit’s structure and increase the longevity of the material to reduce our need for further maintenance. The company is easy to deal with, fast, efficient, and works were completed to a very high standard.’

Billy Sisley, CEO, MCM LTD.

To find out how Toppesfield can add value to your project contact estimating@toppesfield.com.