Hear from some of our previous customers and find out exactly what it’s like to work with Toppesfield.
Toppesfield used innovative working methods to reinforce the circuit’s structure and increase the longevity of the material to reduce our need for further maintenance. The company is east to deal with, fast, efficient and works were completed to a very high standard.
Toppesfield’s flexibility to meet our client’s programme requirements ensured that the Waterloo Blockade was completed on time
Using our new environmentally friendly recycled plastic mix, the Waterworks Bridge Renovation was not a standard surfacing contract. However, the project was highly viable and Toppesfield were professionals throughout. They
worked tirelessly with the client to make sure it was completed to the highest of standards in the shortest time. On all our projects in the Capital we will be going directly to Toppesfield first time, every time.
From start to finish, we were impressed with the service that Toppesfield provided.
Brynglas Tunnels was a very complex and demanding challenge. The concept and design of the delivery involved meticulous planning and coordination. Toppesfield provided the professionalism and support to make this a very successful project. Working through adverse conditions and logistic challenges delivering nearly seven hundred tonnes without defect or delays, over eight, thirty-four-hour closures. The support provided by their management team was second to none with thorough attention given to safety, quality and delivery.
Toppesfield’s innovative approach and can-do attitude, whilst working collaboratively with Amey, ensured efficiencies were achieved.
The experience of using Toppesfield on the A6 Wilstead bypass was nothing short of positive. Excellent quality control and throughout the multiple phased project. With excellent attention to detail with all aspects of the delivery. Having worked in the industry for over 30 years and experienced with all aspects of the laying practices at all levels including the actual laying process rarely have I come across level control in all layers, excellent compaction results and a quality surface course in terms of compliance to standard with testing. First class service from inception to completion.
The project will lead to improved safety and journey reliability.
After establishing a large regional presence in the Midlands from a standing start a little over three years ago, it has been extremely satisfying to help deliver such a significant and important project which will help boost the regional and national economy’
Collaboration with our supply chain is key to our new way of working in the East Midlands and we are looking forward to establishing a successful, long-term relationship with the appointed contractors.
The A5-M1 Link will increase accessibility between Milton Keynes and M1 Junction 9, making journey times shorter and more reliable for vehicles travelling a long distance.
Toppesfield completed this project in a very professional manner. They provided a quality product, in a sensible and practical manner, working fully with the site team to complete the project. They quickly implemented COVID 19 safe work practices to ensure the works could carry on during the national lockdown.
Asphalting specialist, Toppesfield, was chosen to supply and lay the material not just because of its quality and price but also its proactive approach to achieving good results.
“On handover our client was very complimentary and asked multiple times who the surfacing contractor was, wondering why all new tarmac doesn’t look like this. Yet again Toppesfield didn’t let me down. You always do a good job, hence why I keep coming back—the prices help too of course.”
“Toppesfield proved they can adapt to deliver a quality job anywhere in the world and in the harshest of environments.”
“Excellent achievement”